{"id":2883,"date":"2023-10-05T17:05:26","date_gmt":"2023-10-05T15:05:26","guid":{"rendered":"https:\/\/www.cartaecartiere.com\/?p=2883"},"modified":"2023-10-05T17:05:26","modified_gmt":"2023-10-05T15:05:26","slug":"jagenberg-vari-step","status":"publish","type":"post","link":"https:\/\/www.cartaecartiere.com\/en\/jagenberg-vari-step\/","title":{"rendered":"JAGENBERG \u201cVARI-STEP\u201d"},"content":{"rendered":"\n
A great teamwork through the years between both companies, involving SAEL all over the Burgo plant: the Sectional Drive PM1, made in three different steps, the Winder Variroll, Roll wrapper, Supercalender Kleineweffers, Supercalender Bruderhaus, Sheeter Jagenberg Synchro, DCS and stock preparation, DCS for Coating Celliers, DCS & Automation for automatic belts and rolls, DCS for Turbogas and Gas motors, DCS Demi. <\/p>\n\n\n\n
After years of mutual satisfaction being together, Burgo manages SAEL systems and own drives supporting the operators and having spare parts availability for systems installed 35 years ago (actually there are still 55 years old drives renewed by SAEL Reeborn). A long-time profitable partnership: after 30 years of working together, Burgo Group<\/strong> assigned to SAEL<\/strong> the rebuilding of its Jagenberg winder VARI-STEP. <\/p>\n\n\n\n Thanks to the new drive, the efficiency, speed and overall operation have been increased by more than 30%, while the machine management got optimized by new configurations formerly unavailable. \u201cThe spirit of improving\u201d and \u201ccustomer first\u201d have been rewarded by Burgo\u2019s Technology & Investment rebuilding the electrical cabinets and wiring of the VARI-STEP. <\/p>\n\n\n\n To get better performances and flexibility of the machine, the managers of Burgo assigned to SAEL this job. Despite the addition of several automations (roughly 750 machine I\/O) the job was executed extremely fast and successfully. The experience of SAEL technicians, gained over 37 years with countless applications in the retrofitting of all types of drives in the paper industry, made it possible to carry out the rebuild of the Jagenberg rewinder in record time with the help of the DCS Winder SAEL winder control and supervision system. <\/p>\n\n\n\n The scope of the delivery was, in addition to rebuilding the existing electrical wiring, old switchboards and pulpits, the need to be able to secure the machine while complying with the strict and current regulations. The result achieved delivered to the paper mill a very stable, flexible and precise system that immediately repaid the investment. <\/p>\n\n\n\n Precisely because of the perfect adjustment of the drive that processes a mathematical model of the mechanics on a motor regulating the tension (even without the regulation by load cell, +\/- 3% accuracy is guaranteed) and the ductile load distribution between the winding drums, the speed of 2,200 meters per minute was achieved without any modification on the existing installed power.<\/p>\n\n\n\n Further task of the SAEL team was to start up the VARI-STEP rewinder in the shortest possible time; due to the amount of activity and the complexity of the machine itself, it normally takes more than three working weeks of start up and fine tuning. On the other hand, the timeline imposed by the paper mill and related to the short shutdown of the plant that had already been planned for months and was subsequently modified due to the worsening situation of material availability, left no room for error in scheduling and conducting all the activities that were planned minute by minute throughout the shutdown. <\/p>\n\n\n\n The careful analysis and reconnaissance carried out by the technical manager of the paper mill Alberto Cogliati <\/strong>and his team, allowed to reconstruct the existing situation of all the different utilities connected to the rewinder and to integrate them into the project by also equipping them with machine diagnostics, previously not present. The integration of the new plant safety – a prerequisite of the reconstruction – followed the strict regulations required by a perfectly respected risk analysis. <\/p>\n\n\n\n
<\/a><\/figure>\n\n\n\n